First image is a before shot from Google Streetview and the subsequent images are snapshots from today.












DDOT will be presenting their Downtown Streetscape (trees and streetlights) report, which will disclose whether they will include trees and streetlights in the area around the proposed Chinatown Park at 6th and Massachusetts Avenue. We need concerned residents who are concerned about the plight of Chinatown Park to attend the ANC 6C meeting which will be held at the Heritage Foundation at 214 Mass Ave NE starting at 7PM this Tuesday. As you can see from the agenda, several items are being covered.
We need to show DDOT that the neighborhood is concerned with the state of Chinatown Park and the delays to include the public space streetscape improvements that the National Park Service wants to see put into place before the renovation of the park begins.
Please try to come and bring neighbors. Some of us have spent exhaustive hours trying to get this work done and we need to show public support to the ANC and to DDOT.



On the heels of yesterday's posting that outlined the streetscape plans for K Street the natural questions are when will this happen and how will it be paid for?
On two occasions I've recapped the planned upgrades to Fourth Street according to the Final Report for the Mount Vernon Triangle Transportation and Public Realm Design Project. The aim of this posting is to outline the plans for K Street between 7th Street NW and New Jersey Ave NW.Running east-west through the center of the Triangle, K Street is the neighborhood’s major commercial and activity corridor. Verdant in character, K Street also functions as shared urban green space connecting the northern and southern halves of the Triangle. The generous proportions of the street allow for large public gatherings and events, while the development of ground-floor commerce reinforces the street’s function as a neighborhood economic artery. The variability of architectural form and function along the street is addressed by a consistent, unifying streetscape that is still flexible enough to respond to unique conditions.Plans for K Street include the following:
The spatial configuration, material palette, and programming of the K Street landscape accommodate both commerce and daily neighborhood life. Along most of its length, the wide building setback is divided into three zones: a “promenade” sidewalk zone adjacent to the street, a wider “meander” sidewalk zone adjacent to the buildings, and a substantial “median” in between with canopy trees and lush understory planting. Distinct paving differentiates the two pedestrian zones, while a palette of contemporary streetlights, benches, and trash receptacles unifies the entire street and distinguishes it from most other streets within the Triangle.